Closed

WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV · £2,500,000 – £5,000,000 · closes 25 Apr 2025

£2,500,000 – £5,000,000

Estimated value

Closed

Deadline

10 Apr 2025

Published

This tender has closed.

See what's open in construction materials, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction materials tenders

About this contract

WP 15.04 IEP Access and Retaining wall Scope The scope consists of two key components: A new/altered access route at the west end of the Hitachi IEP Depot to facilitate construction works for the wider project. A new retaining wall structure to retain the IEP Depot infrastructure whilst also forming the eastern boundary of the new Old Oak Common Lane alignment. The following will be required: Detailed design, supply and installation of the above scope. Fully coordinated design with the existing and new Old Oak Common Lane alignments, Part 2/3 bridge structure, utilities through Old Oak Common Lane and the GWML UTX tunnels. Provide RIBA 5 design and construction drawings including setting out detailing, general arrangements, and elevation drawings for construction. Provide samples and construct a mock up in accordance with the Old Oak Common Lane Schedule 17 architectural requirements IEP Depot Access Route (Stage 2) - the ramp The existing access route in the southwest corner of the Hitachi IEP Depot needs adapting to suit Old Oak Common (BBVS and SRSA) construction traffic requirements. IEP Depot Retaining Wall Construction of a new bored piled retaining wall supporting the embankment to the south west corner of the IEP Depot. Piling, plunge columns, concrete planks, masonry finish, backfilling, RC concrete Could separate our piling/plunge columns from other works Piling could be incorporated into the highways scope Utility diversions to enable works above Several existing utilities running through the IEP Depot will need to be diverted or managed before major civils and excavation works can commence. These include: Foul sewer Multiple LV electricity supplies Telecoms

Key dates

Published10 Apr 2025
Submission deadline25 Apr 2025 Add to calendar ↓

Source

Tender documents portalOpen ↗
Source notice on Contracts FinderView ↗

Who to contact

NameManish Tailor
Phone07738982498

Tender documents

tenderNoticeOpen ↗
tenderNoticeOpen ↗

Who Balfour Beatty VINCI Systra JV has awarded before

SAS International3 Jan 2025
Kilnbridge Construction Services Ltd3 Jan 2025
VINCI Technology Centre UK Limited30 Apr 2024
RHPPM (Rock and a hard Place Project Management Limited )4 Feb 2022

All tenders from Balfour Beatty VINCI Systra JV

Similar open tenders

Contains public sector information licensed under OGL v3.0