Closed

Replacement Lift within Ward Four (4) at Glangwili General Hospital (GGH)

NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust) · £234,000 · closes 8 Nov 2024

£234,000

Estimated value

Closed

Deadline

9 Oct 2024

Published

This tender has closed.

See what's open in construction work, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction work tenders

About this contract

Hywel Dda University Health Board (HDUHB) have a requirenment to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH). The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features. The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio. Scope of the Contract HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following: - A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow. - The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification. - The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission. The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016.

Key dates

Published9 Oct 2024
Submission deadline8 Nov 2024 Add to calendar ↓

Source

Source notice on Find a TenderView ↗

Lot — bid on it if it fits

This contract has one lot. Bid if it suits your firm.

Hywel Dda University Health Board (HDUHB) have a requirement to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH). The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features. The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio. Scope of the Contract HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following: - A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow. - The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification. - The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission. The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016.Value not published

Who to contact

NameJosh Wood

Similar open tenders

Contains public sector information licensed under OGL v3.0