Provision for Phased strip up and replacement of 36,000m2 of resin bonded Gold Top tarmac to Lee Valley owned areas on Queen Elizabeth Olympic Park

Lee Valley Regional Park Authority · £2,500,000 · closes 4 Feb 2025

£2,500,000

Estimated value

Closed

Deadline

17 Dec 2024

Published

This tender has closed.

See what's open in construction work, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction work tenders

About this contract

The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey andTennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded ‘Gold Top’ surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below.

Key dates

Published17 Dec 2024
Submission deadline4 Feb 2025 Add to calendar ↓

Source

Source notice on Find a TenderView ↗

Lot — bid on it if it fits

This contract has one lot. Bid if it suits your firm.

The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey and Tennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded ‘Gold Top’ surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below.£2,500,000