Paper-based Feasibility study and possible future Demonstration of Mature Solutions for Improving Air Surveillance for the Purposes of Air Defence in Airspace affected by Wind Farms
Ministry of Defence, DE&S ISTAR Windfarm Team · £1 – £1,000,000 · closes 31 Jan 2020
£1 – £1,000,000
Estimated value
Closed
Deadline
9 Dec 2019
Published
This tender has closed.
See what's open in laboratory and precision equipment, or get contracts like this in your inbox each morning — free.
About this contract
Wind turbines can adversely affect a number of MOD operations including radars, seismological recording equipment, communications facilities, naval operations and low flying. These effects are not limited to specific geographical areas. The size of wind turbines as well as the geographical footprint of the next generation of wind farm developments are expected to grow significantly and exacerbate the challenges posed to the UK's AD infrastructure. A solution is required to enable the continued operation of military AD surveillance capability in the presence of current and future wind turbine developments. Additional information: To view this notice, register as a supplier here: http://www.contracts.mod.uk/delta/signup.html?userType=supplier and search for the notice with reference 'UK-Bristol: Radar.'.
Key dates
Source
Who to contact
Tender documents
Similar open tenders
Contains public sector information licensed under OGL v3.0