Closed

Organic Rankine Cycle (ORC) System

KBS Maritime Ltd · Value not published · closes 17 Feb 2025

Estimated value

Closed

Deadline

13 Jan 2025

Published

This tender has closed.

See what's open in construction work, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction work tenders

About this contract

1. General Description Organic Rankine Cycle (ORC) system designed to generate electricity from low-temperature waste heat sources. Its should be capable of operating continuously or intermittently with a CHP engine. 2. Technical Specifications • Net Power Output: 200 – 400 kW per unit • Thermal Power Absorbed: 1000 – 4500 kW • Hot Water Temperature: Minimum 80°C • Working Media: Environmentally friendly, non-toxic, non-flammable • Control System: PLC system / MODBUS TCP

Key dates

Published13 Jan 2025
Submission deadline17 Feb 2025 Add to calendar ↓

Source

Source notice on Find a TenderView ↗

Lot — bid on it if it fits

This contract has one lot. Bid if it suits your firm.

1. General Description Organic Rankine Cycle (ORC) system designed to generate electricity from low-temperature waste heat sources. Its should be capable of operating continuously or intermittently with a CHP engine. 2. Technical Specifications • Net Power Output: 200 – 400 kW per unit • Thermal Power Absorbed: 1000 – 4500 kW • Hot Water Temperature: Minimum 80°C • Working Media: Environmentally friendly, non-toxic, non-flammable • Control System: PLC system / MODBUS TCP£3,500,000

Who to contact

NameDan Jackson

Similar open tenders

Contains public sector information licensed under OGL v3.0