Closed

NRV Culverts NM Corner

Natural England · £33,000 · closes 15 Aug 2024

£33,000

Estimated value

Closed

Deadline

30 Jul 2024

Published

Awarded

Porter Plant Hire Services£27.6k · to 31 March 2025

Awarded 2 September 2024

This tender has closed.

See what's open in construction work, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction work tenders

About this contract

Description of Works Refer to attachment: Natural England Specifications of Requirements - NRV Culverts NM Corner Replace three existing 450mm culverts fitted and non-return valves (flap valves) previously installed in the 1990s. Non-return valves were fitted to act as a water supply into the North Moor Corner Raised Water Level area when water levels within internal ditches are lower than external levels. Structures to allow passage of water into the raised water level area, but in an emergency can also be opened to allow evacuation of water during flood events. The wooden headwalls of the culverts are severely degraded and in places material compacted around the culvert pipes has collapsed into the field and ditch. Replacement structures are required. Each replacement culvert must be/have: • Rigid twin-walled plastic pipe • Internal pipe diameter 450mm • Pipe length 6000mm • Culvert pipe surround of geotextile membrane and clean, crushed, locally sourced stone • Motorway barrier headwalls with 450mm non-return (flap) valve (vertical component of headwall required to reach approximate depth of 3500mm to anchor the structure to the clay bed beneath the peat soils) • 12-foot metal gate with galvanised metal gate posts and wooden wings Working Method will follow: Somerset IDB Gateway Construction Culvert Sequence Guide - utilising Steel Motorway Barrier Headwalls Working area must be isolated with sheet piling and drained prior to commencement of works. Location of works: Wisteria Farm, Middlemoor Drove, North Newton. TA7 0BT. What3Words for the three culvert locations: crowds.supreme.swerving prowling.manicured.safari nuggets.rejoined.grant Additional information: To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation (RFQ) with supporting evidence from attachments: Natural England Specifications of Requirements - NRV Culverts NM Corner, NM Corner IDB Consent Applications NRV1,2 and 3 Culverts, Somerset IDB Gateway Culvert Construction Sequence Guide, Commercial Response Template, and if required, Natural England H&S Contractor Competence. Your response must be sent to philip.thorpe@naturalengland.org.uk by 17:00pm on 15/08/24. If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to philip.thorpe@naturalengland.org.uk. Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers.

Key dates

Published30 Jul 2024
Submission deadline15 Aug 2024 Add to calendar ↓

Source

Tender documents portalOpen ↗
Source notice on Contracts FinderView ↗

Who to contact

NamePhilip Thorpe
Phone07979119406

Tender documents

tenderNoticeOpen ↗
biddingDocumentsOpen ↗
contractDraftOpen ↗
evaluationReportsOpen ↗
technicalSpecificationsOpen ↗
technicalSpecificationsOpen ↗
technicalSpecificationsOpen ↗
technicalSpecificationsOpen ↗
technicalSpecificationsOpen ↗
technicalSpecificationsOpen ↗

Who Natural England has awarded before

KOMPRESSOR HEAT LTD£10,521 · 9 Mar 2025
STONE TECHNICAL SERVICES GROUP LIMITED£18,371 · 9 Mar 2025
Porter Plant Hire Services£11,900 · 4 Mar 2025
Morcomb Construction Ltd£18,900 · 20 Feb 2025

All tenders from Natural England

Similar open tenders

Contains public sector information licensed under OGL v3.0