Closed

MEHT Broomfield Hospital UPS and Electrical Infrastructure upgrading works Project

Mid Essex Hospital Services NHS Trust · £800,000 – £900,000 · closes 24 Feb 2017

£800,000 – £900,000

Estimated value

Closed

Deadline

16 Jan 2017

Published

This tender has closed.

See what's open in construction work, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction work tenders

About this contract

Proposed UPS and Electrical Infrastructure upgrading Project Broomfield Hospital- Mid Essex Hospital Services NHS Trust We are preparing a preliminary list of tenderers for the proposed upgrading of major UPS and electrical infrastructure systems that support essential clinical services at Broomfield Hospital. The scheme will include the replacement of critical UPS equipment, Low Voltage (LV) sub and main distribution cabling and new LV switch panels, complete with new High Voltage substation comprising of new RMU and Transformer. The new equipment will be housed in two separate locations across the hospital site. The first location will be a purpose constructed two storey electrical plant space to house UPS equipment including large battery sets, LV & HV switch panels and intake transformer equipment. The second location will be the refurbishment of an existing plant space in the basement of one of the Hospital buildings and will house UPS equipment, including large battery sets and LV switch panels. The scheme design is at a mature stage for tender purposes, however the contract will be procured on a JCT D&B contract basis. Key project information is as follows:- Description of the Works: These works are intended to upgrade the emergency electrical infrastructure. The UPS (N+1) project consists of creating two new centralised UPS systems to increase capacity and provide N+1 resilience. The upgrading will provide continuity of supply and further improved resilience to serve the Hospitals operating theatre suites and intensive care facilities. The scheme will also replace a section of main LV supply cabling and provide a new HV substation to increase capacity and further improve supply resilience. The scheme design will incorporate provision within the LV switch panel to improve future standby generator capacity as part of a further upgrading scheme in 2018/19. Estimated cost range: £800,000.00 to £900,000.00. Anticipated starting date of the Works: 27 March 2017. Anticipated duration of the Works: 28/30 weeks. Form of Contract: JCT Design and Build Contract 2016. Domestic Sub-contract: Mid Essex Hospital Services NHS Trust has separately tendered, under OJEU, the contract for the design, manufacture, supply, delivery to site, off-loading, moving to place of work, protecting, assembly, installation, testing and commissioning of the UPS supplies. The successful UPS sub-contractor (BPC Energy Limited) will be required to enter into a domestic sub-contract with the successful Principal Contractor. Additional information: Attachments can be found in the ITT Section of the Bravo Solution e sourcing portal reference MEHTT2017002. You will need to register as a supplier to access tender documents see link below.

Key dates

Published16 Jan 2017
Submission deadline24 Feb 2017 Add to calendar ↓

Source

Tender documents portalOpen ↗
Source notice on Contracts FinderView ↗

Who to contact

NameAshley John MCIPS
Phone01245 516242

Tender documents

tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗
tenderNoticeOpen ↗

Similar open tenders

Contains public sector information licensed under OGL v3.0