HS2 - Westgate Sump Pumps(Sub-subcontract Package)
Phoenix M E Ltd · £150,000 – £250,000 · closes 30 Jun 2024
£150,000 – £250,000
Estimated value
Closed
Deadline
25 Jun 2024
Published
This tender has closed.
See what's open in industrial machinery, or get contracts like this in your inbox each morning — free.
About this contract
To install a complete and compliant Public Health installation to the project specifications including (but not limited to) the following: • Design, Supply and installation of the two pump sets at Westgate, the Sump Pump (FSP-01) and Retention Tank Pump Set (RTP-01) • All pipework inside the sump and up to the header including all valves on the header, as shown in demarcation sketch. • 3D drawings to be produced for the inclusion in Phoenix BIM Model showing all devices and guide rails. • All pump guides inside sump or retention tank • Control panels for pumps • Control devices, both analogue and digital. • Commissioning of pumps with a full FAT and SAT • Wiring of control devices between device and control panel • All pumped drainage pipework shown on the 2D drawings from the pump to the header. • All support systems and fixings required to support the pipework in the sump and tank areas • All support systems and fixings required to support the pipework. Supports shall be installed to correct spacings or less, as determined by the pipework calculations. • All Unistrut, drops rods and other materials required to construct brackets and supports are required to be installed to the approved MCR. • Installation check sheets shall be completed by the sub-subcontractor. • Demonstration to Phoenix and client on how the pumps are removed for maintenance.
Key dates
Source
Who to contact
Tender documents
Similar open tenders
Contains public sector information licensed under OGL v3.0