HS2 - Westgate LV Switchgear (Sub-subcontract Package) copy
Phoenix M E Ltd · £250,000 – £500,000 · closes 25 Aug 2023
£250,000 – £500,000
Estimated value
Closed
Deadline
21 Aug 2023
Published
This tender has closed.
See what's open in printing and publishing, or get contracts like this in your inbox each morning — free.
About this contract
PHOENIX ME LIMITED have been successful in securing Westgate MEPH Design & Build part of the Stage Two of the HS2 MWCC for the S1 and S2 sectors with SCS JV (Skanska Construction UK Limited, Costain Limited, STRABAG AG - UK Branch). Stage Two is the detailed design and construction phase of the project. PHOENIX ME LIMITED invites you to submit your tender for providing the Design, Supply, delivery & Commissioning of the Switch Panels, Panel-boards, Metering, PFC package including, Training, O&M's & IST, FAT, SAT & attendance as necessary, as detailed in the Sub-subcontract, in accordance with the Invitation to Tender Enquiry and the documentation appended therein. These works are expected to be delivered in Two Stages, whilst being administered using the NEC3: Engineering and Construction Contract (ECC). Works Stages: Stage One - Design and Preconstruction Activities Stage Two - Manufacturing, Installation and Testing & Commissioning (Including all handover Documentations).
Key dates
Source
Who to contact
Tender documents
Similar open tenders
Contains public sector information licensed under OGL v3.0