This contract is split into lots. You can usually bid for just the ones that suit your firm.
This lot is for hire of labour, materials and plant resources to undertake minor repairs on the highway network, such as pothole repairs and patches. The work to be executed under this framework will be spread over a number of sites within the City.Value not published
Work schemes will be inclusive of but not limited to:
• Vehicle access crossings for both domestic and commercial premises
• Footway reconstruction works
• Carriageway reconstruction works
• Carriageway overlays and inlays
• Drainage installation works
• Ducting installation works
• Kerbing works either new lines or maintenance of existing ones
• Small paving works either lift and relay or renew
• Construction of new small car parks up to 40 spaces
• Section 38 works forming new junctions and accesses on public highway
• Section 278 works alterations to the existing highway
• Small elements of landscaping and planting
• Small elements of road marking
• Installation removal and maintenance of traffic managementValue not published
Work schemes will be inclusive of but not limited to:
• Vehicle access crossings for both domestic and commercial premises
• Footway reconstruction works
• Carriageway reconstruction works
• Carriageway overlays and inlays
• Drainage installation works
• Ducting installation works
• Kerbing works either new lines or maintenance of existing ones
• Small paving works either lift and relay or renew
• Construction of new small car parks up to 40 spaces
• Section 38 works forming new junctions and accesses on public highway
• Section 278 works alterations to the existing highway
• Small elements of landscaping and planting
• Small elements of road marking
• Installation removal and maintenance of traffic managementValue not published
The installation of new ridged paving using propriety bedding mortar and grout and the maintenance of existing paved areas including cleaning repairing and re grouting and re sealing.Value not published
Works may comprise of any or all of the following activities:
• Refreshing existing road markings: to follow the TRO to replace the existing road markings that are
beyond their useful life
• Renewing road markings: following drawings to implement new lining schemes following a
completed scheme
• Removal of existing markings: to remove any unwanted road markings.Value not published
Work schemes will be inclusive of but not limited to:
• Vehicle access crossings for both domestic and commercial premises
• New design and Footway construction works
• New design and Carriageway construction works
• New design and Drainage installation works
• Ducting installation works
• Kerbing works either new lines or maintenance of existing ones
• Paving works either lift and relay or renew
• Design and Construction of new small car parks up to 40 spaces
• Design and construction of Section 38 works forming new junctions and accesses on public
highway
• Design and construction of Section 278 works alterations to the existing highway
• Small elements of landscaping and planting to compliment the scheme
• Small elements of road marking
• Designing of small safety schemes to include junction improvements and traffic calming and
pedestrian safety schemes.
• Designing and construction of small sustainable urban drainage design schemes to either new
or existing infrastructure.
• Temporary works designsValue not published
Vehicle access for domestic and industrial footway crossings .Value not published
Works included within this lot will be:
• Structural works (including bridges and occasional building works);
• Bridge strengthening works;
• Graffiti treatment;
• Maintenance painting of steelwork;
• Waterproofing and joint replacement works;
• Road restraint systems;
• Testing of materials;
• Site investigations;
• Bridge condition surveys; and
• Bridge Maintenance and repairs.Value not published