The Client issues this Selection Questionnaire (“SQ”) for Abuja – Procurement of the Contractor to provide the High Commissioner’s Residence Redevelopment in Abuja, Nigeria in accordance with the UK Public Contract Regulations 2015 as amended by the Public Procurement (EU Exit) Regulations 2020 (referred to as the “regulations”).
Further information can be found at https://fcdo.bravosolution.co.uk/web/login.html
Project No: ESND-11039 -2024
This contract has one lot. Bid if it suits your firm.
The FCDO are seeking experienced contractors to carry out the following package of works:
Residence for the High Commissioner (approx. GIFA 930m2)
• Residential accommodation for staff (20nr x 2 bedroom flats, approx. GIFA 2,745m2)
• Shared swimming pool
• Gatehouse (approx. GIFA 231m2)
• Associated external works and security related works
The main development objectives are:
• Produce a concept which showcases the best of British design, whilst being sympathetic to the local environment and design standards
• Create a Residence suitable for social and official functions, VIP stays and family living
• Create modern residential properties which maximise living space given in the FCDO design standards
• Consolidate the estate in Abuja
• Provide a sustainable compound, keeping ongoing maintenance to a minimum and reducing the average running cost of FCDO residential properties in Abuja
• Provide safe fit for purpose properties in line with the security threat£36,146,519