Flooring
Sussex Coast College · £50,000 · closes 19 Apr 2016
£50,000
Estimated value
Closed
Deadline
18 Nov 2016
Published
This tender has closed.
See what's open in construction work, or get contracts like this in your inbox each morning — free.
About this contract
The work will consist of fitting out three separate areas on the fifth floor of a building which total approximately 1,418m2. The project will not require any final floor covering, and should be finished in galvanised steel. Floor Specification The access floor comprises of 600mm square panels, precision made galvanised steel encased load bearing panels, located on adjustable zinc plated steel support pedestals to provide a rigid platform access floor above the existing floor level. The floor systems will have been designed, tested and manufactured to meet all the requirements laid down in the PSA MOB PF2 OPS SPU. Panel construction is of press formed corrosion resistant galvanised steel encapsulating a high performance chipboard core, providing rigidity with both insulative and acoustic enhancing properties. Pedestal construction is of all steel zinc plated, and consisting of an ant-vibrational head cap with cruciform up stands and four panel locating studs, positively clipped to the steel top plate.
Key dates
Source
Who to contact
Tender documents
Similar open tenders
Contains public sector information licensed under OGL v3.0