Closed

Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV · £5,000,000 – £10,000,000 · closes 21 Feb 2025

£5,000,000 – £10,000,000

Estimated value

Closed

Deadline

7 Feb 2025

Published

This tender has closed.

See what's open in construction work, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction work tenders

About this contract

WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas. 1.1.1.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas. The scope also to include overclad doors, skirtings trims and architectural finished louvres. Note the HS2 station internal artwork cladding panels provided by others. 1.1.1.2 The Contractor will issue a detailed design for pricing as part of the Invitation to Tender. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works. 1.1.1.3 It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030. Key materials for the Subcontractor to fabricate, manufacture and install: 1.1.1.4 Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2. 1.1.1.5 Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2. 1.1.1.6 overall size 2000 x 2500mm high; double leaf doors - 10No. 1.1.1.7 Fire stops to the ceiling level - Approximately 720m. 1.1.1.8 Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2. 1.1.1.9 Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2. 1.1.1.10 Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2. 1.1.1.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2. 1.1.1.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2. 1.1.1.13 Installation of approximately 760m of ceiling firestopping. 1.1.1.14 Installation of 35No double leaf doors, fixings, door jambs and headers. 1.1.1.15 Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands. NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope. Further details can be found on the attached document

Key dates

Published7 Feb 2025
Submission deadline21 Feb 2025 Add to calendar ↓

Source

Tender documents portalOpen ↗
Source notice on Contracts FinderView ↗

Who to contact

NameManish Tailor
Phone07738982498

Tender documents

tenderNoticeOpen ↗
tenderNoticeOpen ↗

Who Balfour Beatty VINCI Systra JV has awarded before

SAS International3 Jan 2025
Kilnbridge Construction Services Ltd3 Jan 2025
VINCI Technology Centre UK Limited30 Apr 2024
RHPPM (Rock and a hard Place Project Management Limited )4 Feb 2022

All tenders from Balfour Beatty VINCI Systra JV

Similar open tenders

Contains public sector information licensed under OGL v3.0