Closed

Carry Out Contestable Work and Install Power Supply to the New Pavilion

Wing Parish Council · Value not published · closes 22 Sept 2023

Estimated value

Closed

Deadline

15 Aug 2023

Published

This tender has closed.

See what's open in public utilities, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen public utilities tenders

About this contract

To carry out the contestable work from the sub station to the recreation ground. Install the required housing for the new supply to the recreation ground. To connect the electricity supply from the new housing to the new pavilion.

Key dates

Published15 Aug 2023
Submission deadline22 Sept 2023 Add to calendar ↓

Source

Source notice on Find a TenderView ↗

Lots — bid on the ones that fit

This contract is split into lots. You can usually bid for just the ones that suit your firm.

A new 180kva electrical supply is required for the new pavilion built on Wing recreation ground, Leighton Road, Wing, Bucks, LU7 0NW. This is a summary of the scope of the work: Install a new LV main from the new LV cabinet to the site. Connect a new service off the new main and terminate to the kiosk, network upgrade is required to be carried out prior to the connection. Connect the new service from the kiosk to the new pavilion. UKPN will be upgrading the substation at Park Gate prior to the connection. UKPN have provided a quote, excluding the work on the recreation ground to the pavilion. The quote includes both uncontestable and contestable work. The uncontested work they are to carry out is: LV Underground Mains Distribution unit termination (LV Board/Cabinet) Excavate, lay & reinstate 300mm LV waveform mains cable in a footway surface type. Pot end of three phase LV CNE service cable & removal of any redundant equipment. Please provide a design for the contestable work and break the quote down into two stages: Lot 1. Install a new LV main from the new LV cabinet to the site. Connect a new service off the new main and terminate to a kiosk, network upgrade is required to be carried out prior to the connection. Lot 2. Connect the new service from the kiosk to the new pavilion. We would be happy to arrange a site visit to discuss the work required. Additional information: • There is a mains gas supply running through the recreation ground, please see the map below. This can only be used as a guideline as a new plastic pipe was installed about 10 years ago and the exact location of the pipe is not known. Depending on the path of the new electric supply, the gas company may need to be onsite when trenching work is carried out. • The electric supply cannot run through the football pitch. • There are a few trees on the recreation ground that need the roots protected due to their size. Four are around the tennis courts and one is located between the football pavilion and the tennis courts. There are no TPOs on any trees but we need to follow best practice in preserving the trees and the root systems. Additional information: All tenders must be submitted in writing and cannot be excepted electronically. All tenders received will be opened at the same time in front of a minimum of three Councillors and the Clerk to the Council.Value not published
A new 180kva electrical supply is required for the new pavilion built on Wing recreation ground, Leighton Road, Wing, Bucks, LU7 0NW. This is a summary of the scope of the work: Install a new LV main from the new LV cabinet to the site. Connect a new service off the new main and terminate to the kiosk, network upgrade is required to be carried out prior to the connection. Connect the new service from the kiosk to the new pavilion. UKPN will be upgrading the substation at Park Gate prior to the connection. UKPN have provided a quote, excluding the work on the recreation ground to the pavilion. The quote includes both uncontestable and contestable work. The uncontested work they are to carry out is: LV Underground Mains Distribution unit termination (LV Board/Cabinet) Excavate, lay & reinstate 300mm LV waveform mains cable in a footway surface type. Pot end of three phase LV CNE service cable & removal of any redundant equipment. Please provide a design for the contestable work and break the quote down into two stages: Lot 1. Install a new LV main from the new LV cabinet to the site. Connect a new service off the new main and terminate to a kiosk, network upgrade is required to be carried out prior to the connection. Lot 2. Connect the new service from the kiosk to the new pavilion. We would be happy to arrange a site visit to discuss the work required. Additional information: • There is a mains gas supply running through the recreation ground, please see the map below. This can only be used as a guideline as a new plastic pipe was installed about 10 years ago and the exact location of the pipe is not known. Depending on the path of the new electric supply, the gas company may need to be onsite when trenching work is carried out. • The electric supply cannot run through the football pitch. • There are a few trees on the recreation ground that need the roots protected due to their size. Four are around the tennis courts and one is located between the football pavilion and the tennis courts. There are no TPOs on any trees but we need to follow best practice in preserving the trees and the root systems. Additional information: All tenders must be submitted in writing and cannot be excepted electronically. All tenders received will be opened at the same time in front of a minimum of three Councillors and the Clerk to the Council.Value not published

Who to contact

NameClaire Power
Phone+44 7415296793

Similar open tenders

Contains public sector information licensed under OGL v3.0