Camel Footbridge Wadebridge Maintenance and Repair
Corserv Ltd on behalf of Cormac Solutions Ltd. · £250,000 · closes 24 Jan 2020
£250,000
Estimated value
Closed
Deadline
16 Dec 2019
Published
This tender has closed.
See what's open in construction work, or get contracts like this in your inbox each morning — free.
About this contract
The Camel Footbridge carries the maintainable public footpath over the River Camel between Egloshayle Road and Wadebridge Town centre. The structure consists of a two span cable stayed suspension bridge. The total length is 62m with a main span of 40m. The bridge tower support is founded within the River bed and extends 16m high above the deck. The bridge consists of a steelwork deck frame and tower with timber decking and aluminium balustrading. The deck is suspended from 8 pairs of steel cables (16 cables and 32 connectors). The project aim is to undertake major maintenance works on the cable stay Camel footbridge in Wadebridge safeguarding the structure for continued use. The intention is to appoint a suitably qualified and experienced contractor to undertake this works. Additional information: The tender can be accessed via the Proactis Supplying the South West etendering portal. Here is the link: https://procontract.due-north.com/Advert?advertId=5e614756-fb1f-ea11-80fc-005056b64545&p=696a9836-1895-e511-8105-000c29c9ba21
Key dates
Source
Who to contact
Tender documents
Similar open tenders
Contains public sector information licensed under OGL v3.0