Closed

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED · £5,000 · closes 6 Mar 2026

£5,000

Estimated value

Closed

Deadline

20 Feb 2026

Published

This tender has closed.

See what's open in construction materials, or get contracts like this in your inbox each morning — free.

Set up free alertsOpen construction materials tenders

About this contract

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

Key dates

Published20 Feb 2026
Submission deadline6 Mar 2026 Add to calendar ↓

Source

Tender documents portalOpen ↗
Source notice on Contracts FinderView ↗

Who to contact

NameHannah Tuckley
Phone07395 881 614

Tender documents

tenderNoticeOpen ↗

Similar open tenders

Contains public sector information licensed under OGL v3.0